MOQ: | 30pieces |
Price: | Negotiable |
Standard Packaging: | Case |
Delivery Period: | 15-35days |
Payment Method: | L/C, T/T |
Supply Capacity: | 6000pieces/month. |
Powerline Tools Tirfor Tyler Tool Aluminum Wire Rope Winch with Cable
Works In Any Position; Horizontal, Vertical, Or Angled
Fast And Easy Installation And Use
High Mechanical Advantage
Each Hoist Is Equipped With Overload Shear Pins
TU Range, " UL " Classified For Man-Riding Applications For Use As A Scaffold Hoist
Increase the nominal capacity with multiple sheave blocks
Long length of wire rope much easier to handle than chain
The load is always permanently controlled in the utmost precision: when operation stops, the load is distributed on two jaw blocks
Reduced maintenance with simple cleaning and regular lubrication
Change from forward to reverse operation by transferring the operating handle from one lever to another
Model | Lifting capacity (kN) | Pulling capacity (kN) | Rope diameter (mm) | Rope length (m) | Mass (kg) |
TFX-8 | 8 | 12.5 | 8 | 20 | 6 |
TFX-10 | 10 | 15 | 8 | 20 | 6 |
TFX-16 | 16 | 25 | 11 | 20 | 12 |
TFX-32 | 32 | 50 | 16 | 10 | 23 |
TFX-54 | 54 | 80 | 20 | 10 | 45 |
Simple structure and powerful function | Fast and easy installation, Simple to feed in or remove the wire rope, Continuous operation without snatching, Changeover from forward to reverse operation by transferring the operating handle from one lever to another, Works in any position horizontal, vertical or angled. |
The length of the wire rope is not limited | Standard length of steel wire rope is 20 meters but custom length s available on request. |
Safe and reliable | Each Hoist is tested to 1.5 times of the rated capacity. The jaws and connecting axle have been quenched, and the modules have been electroplated. The performance of the products will not be affected after the four-fold strength test. |
Increase the nominal capacity with multiple sheave blocks | The rated load of the machine can be increased with the snatch block and the traction direction of the machine can be changed by the fixed snatch block or fixed object. |
Safety device to prevent overloading | Each Hoist has a built in shear pin which is designed to break at approximately 25% above the working load limit, this prevents excessive over loading. The pins can be replaced without releasing the load. two spare pin s are located In the carry handle. |
Load positioning accurate to mm | Whether lifting or lowering, the load is permanently controlled with the utmost precision; when operation st load is spread between the two jaw blocks. |
Construction,public works,civil engineering | moving and positioning form work horizontally or vertically;positioning sections of precast concrete beams; |
Pipelaying and jointing | positioning of pipes for welding and jointing;laying concrete pipes and pulling them together; |
Bridges | positioning form work; guying; pulling pre-cast concrete beams; |
Industry | installation and removal of machine tools and presses;lifting and pulling during maintenance operations;loading and unloading of heavy equipment;pulling pre-cast concrete beams; |
Escalators,elevators | loading,unloading and rigging of prefabricated escalators;lifting and positioning the cabins and drawing mechanisms; |
Electricity and telecommunications | positioning transformers; tensioning underground and over head cable;erection of mobile aerials and antennas; guying operations; |
Mines and quarries | handling and positioning equipment and underground machinery;tensioning conveyors; and wherever there is a need for lifting, or puling heavy load |
MOQ: | 30pieces |
Price: | Negotiable |
Standard Packaging: | Case |
Delivery Period: | 15-35days |
Payment Method: | L/C, T/T |
Supply Capacity: | 6000pieces/month. |
Powerline Tools Tirfor Tyler Tool Aluminum Wire Rope Winch with Cable
Works In Any Position; Horizontal, Vertical, Or Angled
Fast And Easy Installation And Use
High Mechanical Advantage
Each Hoist Is Equipped With Overload Shear Pins
TU Range, " UL " Classified For Man-Riding Applications For Use As A Scaffold Hoist
Increase the nominal capacity with multiple sheave blocks
Long length of wire rope much easier to handle than chain
The load is always permanently controlled in the utmost precision: when operation stops, the load is distributed on two jaw blocks
Reduced maintenance with simple cleaning and regular lubrication
Change from forward to reverse operation by transferring the operating handle from one lever to another
Model | Lifting capacity (kN) | Pulling capacity (kN) | Rope diameter (mm) | Rope length (m) | Mass (kg) |
TFX-8 | 8 | 12.5 | 8 | 20 | 6 |
TFX-10 | 10 | 15 | 8 | 20 | 6 |
TFX-16 | 16 | 25 | 11 | 20 | 12 |
TFX-32 | 32 | 50 | 16 | 10 | 23 |
TFX-54 | 54 | 80 | 20 | 10 | 45 |
Simple structure and powerful function | Fast and easy installation, Simple to feed in or remove the wire rope, Continuous operation without snatching, Changeover from forward to reverse operation by transferring the operating handle from one lever to another, Works in any position horizontal, vertical or angled. |
The length of the wire rope is not limited | Standard length of steel wire rope is 20 meters but custom length s available on request. |
Safe and reliable | Each Hoist is tested to 1.5 times of the rated capacity. The jaws and connecting axle have been quenched, and the modules have been electroplated. The performance of the products will not be affected after the four-fold strength test. |
Increase the nominal capacity with multiple sheave blocks | The rated load of the machine can be increased with the snatch block and the traction direction of the machine can be changed by the fixed snatch block or fixed object. |
Safety device to prevent overloading | Each Hoist has a built in shear pin which is designed to break at approximately 25% above the working load limit, this prevents excessive over loading. The pins can be replaced without releasing the load. two spare pin s are located In the carry handle. |
Load positioning accurate to mm | Whether lifting or lowering, the load is permanently controlled with the utmost precision; when operation st load is spread between the two jaw blocks. |
Construction,public works,civil engineering | moving and positioning form work horizontally or vertically;positioning sections of precast concrete beams; |
Pipelaying and jointing | positioning of pipes for welding and jointing;laying concrete pipes and pulling them together; |
Bridges | positioning form work; guying; pulling pre-cast concrete beams; |
Industry | installation and removal of machine tools and presses;lifting and pulling during maintenance operations;loading and unloading of heavy equipment;pulling pre-cast concrete beams; |
Escalators,elevators | loading,unloading and rigging of prefabricated escalators;lifting and positioning the cabins and drawing mechanisms; |
Electricity and telecommunications | positioning transformers; tensioning underground and over head cable;erection of mobile aerials and antennas; guying operations; |
Mines and quarries | handling and positioning equipment and underground machinery;tensioning conveyors; and wherever there is a need for lifting, or puling heavy load |